Short Plat & Unit Lot Subdivision in Seattle, WA

A short plat divides one parcel into a small number of new lots through an administrative process run by the city, rather than the full hearing a long plat needs. In Seattle, unit lot subdivisions let a townhouse or cottage development be split so each home sits on its own lot and can be sold separately. Washington's middle-housing law has made both far more common, as single-house lots across the region are redeveloped with several homes. The survey sits underneath the whole application: the existing boundary and topography first, then the proposed lots, easements for shared access and utilities, and the legal descriptions for each new parcel. The final map is recorded with King County. Whether a split works under the zoning is a design and land-use question for your architect or land-use consultant; we produce the survey and the recording map, and coordinate with them.

One Lot Becoming Several

A short plat is Washington's streamlined process for dividing land into a small number of lots. State law, RCW 58.17, sets the default at four and lets a city raise that ceiling to nine by ordinance; larger divisions go through a full long plat. In Seattle a short subdivision is reviewed by the Seattle Department of Construction and Inspections as a land use decision, with public notice and an opportunity to comment before the director decides. Other cities run their own versions: Bellevue, Kirkland, Shoreline and Kent each have their own codes, lot standards and application checklists, so the same idea is assembled differently depending on which side of a city limit the parcel sits.

Unit Lot Subdivision and Middle Housing

Much of the dividing happening now is not a house lot becoming two house lots. It is a single parcel redeveloped as a row of townhouses or a cluster of cottages, each sold with the ground beneath it. Seattle handles that through unit lot subdivision under SMC 23.24.045, where development standards apply to the parent lot as a whole while each unit lot is conveyed separately, and the plat is usually reviewed alongside or after the building permit for the homes themselves. Washington's 2023 middle-housing law, HB 1110, requires cities above certain population thresholds to allow several units on lots once zoned for a single house, which widens where this kind of project is possible across the region's residential neighborhoods.

The Surveyor's Share of the Application

The process starts with a boundary survey and a topographic survey of the parent parcel, because proposed lots, access, utility routes and any critical-area buffers are all drawn over that base. From there we prepare the plat drawing and the legal descriptions for each new lot and for shared access and utility easements, revise them through review comments, and set the new lot corners in the ground. The approved plat is recorded with King County, and it becomes the document every future owner and surveyor relies on.

What Stays With the Design Team

Whether the zoning allows the lot count you have in mind, how the units are laid out, drainage design and utility capacity belong to your architect, civil engineer and the reviewing city. We work alongside them, not in place of them. Where the goal is only to shift an existing line between two parcels rather than create new lots, a lot boundary adjustment is the simpler route. Where unit lot lines are meant to follow shared walls, an as-built survey confirms where those walls actually went.

How long does it take? Governed by the city's review timeline rather than field work. The survey is usually ready long before the application is approved.

Frequently Asked Questions

How many lots can a short plat create?
Washington law lets cities allow up to nine lots through the short-plat process, and each city sets its own limit within that. Tell us the address and what you hope to build, and we will point you at the right process before you commit to a design.
What is a unit lot subdivision?
A Seattle process that divides a townhouse, rowhouse or cottage development into individual lots for each home while the development as a whole is reviewed against the zoning. It is how many new Seattle townhouses become separately sellable.

Related Surveys

These are usually asked for on the same transaction:

Free - No obligation

Get Your Free Quote

Two minutes. We come back to you the same business day.

  • Free quote, no obligation
  • Tell us the deadline and we tell you if it is achievable
  • Rush scheduling for closings and filings
  • Mapped to the standard the requesting party accepts

Get Your Free Quote

Permit or closing date this week? Call (253) 648-7331 and say so - we will tell you on the call whether it is achievable.

Got it - we will come back to you today

If it is urgent, call us now on (253) 648-7331