An as-built survey records what was actually constructed and where it sits: footprint, setbacks, heights where required, and site features, measured against the permitted plans. In the Seattle area it is most often asked for at the end of a project - a city wanting verification that a new house, townhouse or backyard cottage meets its setbacks or height limit, or a lender wanting the finished footprint - and in the middle of one, when a foundation location has to be confirmed before framing continues. It is also the starting point when older unpermitted work is being brought into compliance, because nothing can be applied for until someone has measured what is there. The drawing says plainly where the built work differs from the plans; that difference is usually the reason it was requested.

Measuring What Was Actually Built

An as-built survey records the finished position and elevation of work after it is in place: a foundation after the pour, a completed house, a retaining wall, a driveway, a new side sewer or storm line. Its purpose is comparison. Plans describe intent, and construction drifts from intent by a few inches or a few feet for ordinary reasons - a form moved, a footing widened, a wall shifted around a root. The as-built shows where the work ended up relative to the property line, the setbacks and the approved elevations, while it is still cheap to correct.

Foundation Checks and Height Limits

The most useful time to order one is often right after the foundation is poured, before framing goes up. At that stage an error in setback or position can still be addressed, where after framing it becomes a variance request or a demolition. On tight Seattle lots with backyard cottages or townhouses, and on lots where a new house has been designed close to its maximum permitted height, a foundation check and later a roof-height verification are commonly requested by the builder, the lender or the reviewing jurisdiction. Height in particular is measured from a reference grade defined in the code, so the survey has to use the same reference the permit drawings did.

Utilities, Drainage and Hidden Work

Buried work is the other common reason. Storm drainage systems, detention structures, infiltration facilities and side sewers are regularly required to be recorded in position and elevation after installation, and that information is only easy to capture while trenches are open. Projects in Bellevue, Renton and Kent, each with their own drainage requirements, often need as-built drawings of these systems before final approval. Waterfront work on Mercer Island and in Kirkland - bulkheads, docks, shoreline plantings - may need locating against the ordinary high water mark once complete.

Tying It Back to the Earlier Work

An as-built is most reliable when it uses the same control and datum as the topographic survey the design was based on and the construction staking that laid it out, so any difference reflects the building rather than the measurement. We note the plan revision each element is being compared against. Where finished floor elevations sit in a mapped flood zone, the same measurements can support a post-construction elevation certificate. The as-built reports conditions; whether a deviation is acceptable is decided by the engineer of record and the permitting authority.

How long does it take? Proportional to the size of the project and access to it. A single cottage is quick; a multi-unit site is not.

Frequently Asked Questions

The inspector wants a setback verification. Is that an as-built?
Usually, yes - a survey of the foundation or finished building showing its distance from the property lines, and sometimes its height against a datum. Forward the inspector's correction notice and we will match the scope to it.
A previous owner built without a permit. Where do we start?
With an as-built in almost every case. A permit application to legalise existing work needs accurate plans of what is standing, and your designer or permit consultant will ask for the measurements first.

Related Surveys

These are usually asked for on the same transaction:

Free - No obligation

Get Your Free Quote

Two minutes. We come back to you the same business day.

  • Free quote, no obligation
  • Tell us the deadline and we tell you if it is achievable
  • Rush scheduling for closings and filings
  • Mapped to the standard the requesting party accepts

Get Your Free Quote

Permit or closing date this week? Call (253) 648-7331 and say so - we will tell you on the call whether it is achievable.

Got it - we will come back to you today

If it is urgent, call us now on (253) 648-7331